Skip to main content Skip to office menu Skip to footer
Capital IconMinnesota Legislature

Your Selected Archive


House Transportation Policy and Finance Committee


Monday, April 11, 2016 - 12:49 PM

07:55 - Gavel, and discussion and overview on several MnDOT bridge projects including the Saint Croix River Crossing Bridge, Highway 43 Winona Bridge, Highway 53 relocation and bridge and Edina Highway 169 Nine Mile Creek proposed bridge. Topics include:. • Overview of each project: location, cost, initial construction schedule time period and what is current projection for completion, and type of project contract (design build, low bid, etc.). • Bidding and selection of contractor process and criteria used to select a contractor for a project and determining who is qualified to bid for projects on the "short list" and how contractors applying for projects are scored/ranked for project selection. • How MnDOT selects type of construction process contract for project (i.e. design build, low bid, cost plus, Construction Manager General Contractor, etc.) and what the benefits of each type of contract method are. • How MnDOT "Best Value" procurement process affects project selection and costs. • Process to select a design for a bridge and what process was used for these projects, including public participation in design selection process. • Issues/delays/cost overruns which have arisen on these projects under construction and why and what additional time and cost is needed to address issues to complete the project over initial timetable, and is there any correlation between contract type and schedule delays or cost overruns. Runs 1 hour, 44 minutes.